NowBIM LTD

Committed to
Deliver Excellence

We produce coordinated MEP BIM models, shop drawings, and firestopping documentation for contractors, fabricators, and consultants. Clash-free, construction-ready files from your approved designs.

Request a Quote
Detailed BIM architectural model with MEP systems

MEP BIM Specialists


NowBIM produces coordinated MEP BIM models and shop drawings from your approved design documentation. We work with contractors, fabricators, and consultants to deliver clash-free, construction-ready files.

We accept 2D PDFs, AutoCAD (.DWG), and Revit (.RVT) files, MEP schematics, riser diagrams, and architectural or structural models. We also work with your BIM Execution Plans and Employer's Information Requirements.

Our Services


BIM services from modelling through to construction-ready documentation and project closeout.

MEP BIM Modelling

We create 3D models for Mechanical, Electrical, and Plumbing systems. These models are used for design validation, clash detection, and producing construction documentation.

Clash Detection & Coordination

We find and fix clashes across all trades, including fire protection, before construction starts. This cuts rework costs and prevents installation problems on site.

Shop Drawings

We produce clear, accurate shop drawings from our coordinated BIM models. Ready for fabrication and installation.

Project Management

We manage BIM scopes from kickoff to closeout. We coordinate with stakeholders, track deliverables, and make sure deadlines are met.

As-Built Models

We update BIM models to match what was actually built. Useful for facility management and future renovations.

Fire Protection & Sprinkler Modelling

We model fire protection systems including sprinkler layouts. Our models meet NFPA standards and local codes, and fit into the overall MEP coordination.

Integrated Firestopping Coordination


Firestopping is part of any building's passive fire protection. When MEP penetrations through fire-rated assemblies aren't managed properly, the fire rating is compromised.

We model, track, and resolve all penetrations through fire-rated walls, floors, and ceilings before construction starts. This cuts rework and delays.

By building firestopping into the MEP BIM workflow, projects are spatially coordinated, code-compliant, and ready for inspection. Firestopping gets dealt with early, not as an afterthought.

Detailed MEP mechanical room coordination model

Standards & Inputs


We Model To

  • ISO 19650 (Information management using BIM)
  • BS EN ISO 16739 (IFC standard for openBIM data exchange)
  • BS 1192 (Collaborative production of construction information)
  • Your naming conventions, worksets, and layering standards on request

What We Accept

  • 2D PDFs, AutoCAD (.DWG), Revit (.RVT) files
  • MEP Schematics and Riser Diagrams
  • Architectural and Structural models
  • BIM Execution Plans (BEP), Employer's Information Requirements (EIR)

Get a Quote

Send your project brief or tender package. We'll get back to you with a quote specific to your project.

We usually reply within 24-48 hours.

Send an Enquiry

Drop us a message and we'll be in touch.